Pharmaron UK
Hoddesdon
The Problem
Pharmaceutical laboratory in Hoddesdon. The internal metal housing was set 10mm off the surrounding concrete surfaces. Because of the extreme temperatures for testing products the laboratory was condensating.
The Solution
With specialised sacrificial lines that will get into 5mm gaps,we were able to inject under the floor and fill the gaps causing problems.
The Result
100% success and very happy customer. For complete satisfaction on difficult and highly sensitive sites we have specialised solutions.