Berkeley Homes

Chiswick Gate

The Problem

New high end development in West London. Problem caused in stairwells and stud walls were standard procedure has failed to achieve necessary DB ratings.

The Solution

We decided on a retro fit to inject polyurethane acoustic foam into the step curvature by injection at intervals of quarter of a metre. The holes were 5mm in diameter. The stud walls have the same treatment. After installation the holes are made good. The project takes 1 full day and means structure is kept in place without disturbance.

  • Metropolitan Insulation: Berkeley Group

Domestic