Kia Flagship Showroom
Brentford
The Work
Kias new flagship showroom off the elevated M4 at Brentford. For Paragon the main contractor.
The Problem
Services have been installed after the Kingspan had been installed on concrete soffit. The issues were as you can see, how to insulate and fill these areas with speed, efficiency and the ability to access if necessary at a later date. The traditional method doing what's already in situ would take days and be labour intensive.
The Solution
Inject voids with low density open cell PIR system to fill the voids,200 metres in one full day leaving it accessible to operatives if needs in future.
The Result
Complete infill achieved with Class 1 Fire Rated product within the Building Control remit. Happy main contractor and client.